aboutsummaryrefslogtreecommitdiff
path: root/src/time.cpp
diff options
context:
space:
mode:
Diffstat (limited to 'src/time.cpp')
-rwxr-xr-xsrc/time.cpp120
1 files changed, 102 insertions, 18 deletions
diff --git a/src/time.cpp b/src/time.cpp
index c71521a..15dd0ce 100755
--- a/src/time.cpp
+++ b/src/time.cpp
@@ -135,7 +135,7 @@ workday::workday(const moment& previous_wrap,
call+(delta){0, 4, 0})};
// ^ Minimum 4 hour day ^
- const int sp_length = 10;
+ const int sp_length = 11;
moment splitpoints[sp_length]{ // --$-- Points where the price may change --$-- //
// NOTE: Maybe this should also contain the valuefactor associated with the split.
@@ -144,22 +144,23 @@ workday::workday(const moment& previous_wrap,
// Or maybe I should just implement this badly at first just to get it working, and replace it later?
previous_wrap+(delta){0, 10, 0}, // Sleepbreach, 10 hours after previous wrap 0x
- (moment){0, 5, call.day, call.month, call.year}, // 2 hours before 7, aka 5 1
+ (moment){0, 5, call.day, call.month, call.year}, // 2 hours before 7, aka 5 1x
(moment){0, 6, call.day, call.month, call.year}, // 6 in the morning 2x
call+(delta){0, 8, 0}, // Normal 8 hours of work 3x
call+(delta){0, 9, 0}, // 1st hour of overtime is over 4x
- planned_wraptime, // End of warned overtime 5x
- call+(delta){0, 14, 0}, // The 14-hour mark 6x
- (moment){0, 22, call.day, call.month, call.year}, // 22:00 in the evening 7x
- (moment){0, 23, call.day, call.month, call.year}+(delta){0, 1, 0}, // Midnight 8x
- (moment){0, 23, call.day, call.month, call.year}+(delta){0, 7, 0}, // 6, next morning 9x
+ call+(delta){0, 11, 0}, // 3st hour of overtime is over 5x
+ planned_wraptime, // End of warned overtime 6x
+ call+(delta){0, 14, 0}, // The 14-hour mark 7x
+ (moment){0, 22, call.day, call.month, call.year}, // 22:00 in the evening 8x
+ (moment){0, 23, call.day, call.month, call.year}+(delta){0, 1, 0}, // Midnight 9x
+ (moment){0, 23, call.day, call.month, call.year}+(delta){0, 7, 0}, // 6, next morning 10x
};
// Eliminate planned wrap, if it occurs within normal 8-hour period.
// This is to make sure the first period of time becomes a pure 8 hours,
// which makes detecting the main section of the workday easier.
- if(splitpoints[5] < splitpoints[3]){
- splitpoints[5] = splitpoints[3];
+ if(splitpoints[6] < splitpoints[3]){
+ splitpoints[6] = splitpoints[3];
}
moment splitpoints_sorted[sp_length];
@@ -181,12 +182,8 @@ workday::workday(const moment& previous_wrap,
// THE VALUE-FACTOR CALCULATION PART
- // TODO: Complete the valuefactor calculation ruleset
- // Including, Easter and other holidays
- // TODO: Implement a good system for this fuckin' paragraph:
- // A. 50 % tillegg for arbeid inntil 2 timer før, eller inntil 3 timer etter ordinær arbeidstid når arbeidstiden ikke er forskjøvet og overtiden er varslet. Dersom det varsles overtid både før og etter ordinær arbeidstid betales de to første timene med 50 % tillegg og de øvrige med 100 % tillegg.
-
- // TODO: Add reasons for the upped valuefactors.
+ // TODO: Test holidays
+ // TODO: Consider replacing splitpoints[x] with redoing the math for code flexibility?
for(int ii=0; ii < total_timeblocks; ii++){
timeblock& each_block = blocks[ii];
@@ -199,11 +196,39 @@ workday::workday(const moment& previous_wrap,
if(each_block.start >= splitpoints[3]) {each_block.upvalue(1.5, "Overtime"); // Overtime
if(each_block.start.getweekday() == saturday) each_block.upvalue(2, "Saturday overtime");// on saturdays
}
+ if(each_block.start >= splitpoints[5]) each_block.upvalue(2, "Overtime"); // End of 3-hour cheap planned overtime
if(each_block.start >= planned_wraptime && // Unwarned overtime
each_block.start >= splitpoints[4]) each_block.upvalue(2, "Overtime"); // +100% after first hour
- if(each_block.start >= splitpoints[6]) each_block.upvalue(3, "Far overtime"); // +200% beyond 14-hour mark
+ if(each_block.start >= splitpoints[7]) each_block.upvalue(3, "Far overtime"); // +200% beyond 14-hour mark
if(each_block.start.getweekday() == saturday) each_block.upvalue(1.5, "Saturday");// Saturdays are +50%
if(each_block.start.getweekday() == sunday) each_block.upvalue(2, "Sunday"); // Sundays are +100%
+
+ if(!(call < (moment){0, 7, call.day, call.month, call.year} && // On an offset day...
+ std::min(call+(delta){0,8,0}, wrap) < (moment){0,17,call.day,call.month,call.year})) {
+ // This was added for rule 6.11c, but in a world without a defined normal workday,
+ // that rule is already covered already by 6.11g, so this is empty.
+ }
+
+ // Holidays!
+ if(each_block.start.day==1 && each_block.start.month==1) each_block.upvalue(2, "New year");
+ if(each_block.start.day==1 && each_block.start.month==5) each_block.upvalue(2, "1st of May");
+ if(each_block.start.day==17 && each_block.start.month==5) each_block.upvalue(2, "17st of May");
+ if((each_block.start.day==25 || each_block.start.day==26) && each_block.start.month==12)
+ each_block.upvalue(2, "Christmas");
+ moment easter = gaussEaster(each_block.start.year);
+ if(each_block.start.day == (easter-(delta){0,0,-3}).day &&
+ each_block.start.month == (easter-(delta){0,0,-3}).month) each_block.upvalue(2, "Maundy Thursday");
+ if(each_block.start.day == (easter-(delta){0,0,-2}).day &&
+ each_block.start.month == (easter-(delta){0,0,-2}).month) each_block.upvalue(2, "Good Friday");
+ if(each_block.start.day == easter.day && each_block.start.month == easter.month) each_block.upvalue(2, "Easter");
+ if(each_block.start.day == (easter-(delta){0,0,1}).day &&
+ each_block.start.month == (easter-(delta){0,0,1}).month) each_block.upvalue(2, "Easter");
+ if(each_block.start.day == (easter-(delta){0,0,39}).day &&
+ each_block.start.month == (easter-(delta){0,0,39}).month) each_block.upvalue(2, "Feast of the Ascension");
+ if(each_block.start.day == (easter-(delta){0,0,49}).day &&
+ each_block.start.month == (easter-(delta){0,0,49}).month) each_block.upvalue(2, "Pentecost");
+ if(each_block.start.day == (easter-(delta){0,0,50}).day &&
+ each_block.start.month == (easter-(delta){0,0,50}).month) each_block.upvalue(2, "Pentecost Monday");
}
}
@@ -283,11 +308,72 @@ weekday moment::getweekday() {
return static_cast<weekday>((y + y / 4 - y / 100 + y / 400 + t[month - 1] + day - 1) % 7);
}
+bool moment::isEaster() {
+ moment easter = gaussEaster(year);
+ return (easter.month==month && easter.day==day);
+}
+
//
// --- FUNCTIONS ---
//
+moment gaussEaster(int year) {
+ // Thanks to Carl Friedrich Gauss for the algorythm
+ // Thanks rahulhegde97, bansal_rtk_, code_hunt, sanjoy_62, simranarora5sos and aashutoshparoha on GeeksForGeeks for the implementation I based this on.
+ float A, B, C, P, Q, M, N, D, E;
+ int easter_month = 0;
+ int easter_day = 0;
+
+ // All calculations done
+ // on the basis of
+ // Gauss Easter Algorithm
+ A = year % 19;
+ B = year % 4;
+ C = year % 7;
+ P = std::floor((float)year / 100.0);
+
+ Q = std::floor((float)(13 + 8 * P) / 25.0);
+
+ M = (int)(15 - Q + P - (std::floor)(P / 4)) % 30;
+
+ N = (int)(4 + P - (std::floor)(P / 4)) % 7;
+
+ D = (int)(19 * A + M) % 30;
+
+ E = (int)(2 * B + 4 * C + 6 * D + N) % 7;
+
+ int days = (int)(22 + D + E);
+ easter_day = days;
+
+ // A corner case,
+ // when D is 29
+ if ((D == 29) && (E == 6)) {
+ easter_month = 4;
+ easter_day = 19;
+ }
+ // Another corner case,
+ // when D is 28
+ else if ((D == 28) && (E == 6)) {
+ easter_month = 4;
+ easter_day = 18;
+ }
+ else {
+ // If days > 31, move to April
+ // April = 4th Month
+ if (days > 31) {
+ easter_month = 04;
+ easter_day = days-31;
+ }
+ else {
+ // Otherwise, stay on March
+ // March = 3rd Month
+ easter_month = 03;
+ }
+ }
+ return (moment){0,0, easter_day, easter_month, year};
+}
+
std::string padint(const int input, const int minimum_signs) {
std::ostringstream output;
output << std::internal << std::setfill('0') << std::setw(minimum_signs) << input;
@@ -336,8 +422,6 @@ void wind(moment& input_moment, const int minutes, const int hours, const int da
}
// Adding days
- // XXX: This will cause trouble if you wind time by more than a month's length in days.
- // So, let's just not do that... heh...
input_moment.day += days;
int current_month_length = days_in(input_moment.month, input_moment.year);
while(input_moment.day > current_month_length) {